Planned Power, Steam and Hot Water Outage in New Research Building
- Start: Friday, Sept. 18, 10 p.m.
- End: Saturday, Sept. 19, 5 a.m.
- Impact: The power outage will occur in increments, and the maximum outage length will be three hours. The steam and hot water outage will be continuous from 10 p.m. to 5 a.m., resulting in no heat and hot water to the East Wing of the New Research Building throughout the duration of that time period.