Archive: Active Construction
15 Articles
- Active Construction
Electrical Panel Work in ICC Offices
Start: Monday, Aug. 10, 2026, at 5 a.m. End: Tuesday, Aug. 11, 2026, at 10 a.m. Impact: Please be advised that on Monday, Aug. 10, and Tuesday, Aug. 11, as part of the…
August 7, 2026
- Active Construction
Emergency Water Outage in Med-Dent Building
Start: Wednesday, Aug. 5, at 5:30 a.m. End: Wednesday, Aug. 5, at 7:30 a.m. Impact: There will be no domestic hot or cold water available in the Med-Dent Building during…
August 4, 2026
- Active Construction
Revised Time: Upcoming DC Clean Waters Blast on Aug. 3, 2026
This is an automated notification that DC Water has scheduled a controlled underground blast near the Georgetown University campus as part of the Potomac River Tunnel Project.…
August 3, 2026
- Active Construction
Planned Power, Heating, and Cooling Outage Affecting White-Gravenor Hall and Copley Hall
Start: Saturday, Aug. 8, 2026, at 10 a.m. End: Saturday, Aug. 8, 2026, at 8 p.m. Impact: There will be a planned power, heating and cooling outage in White-Gravenor Hall…
July 31, 2026
- Active Construction
Sprinkler Replacement in New North
Start: Friday, July 31, 2026, at 6 a.m. End: Friday, July 31, 2026, at 2 p.m. Impact: On Friday, July 31, as part of the ongoing sprinkler system improvements within the…
July 29, 2026
- Active Construction
Upcoming DC Clean Waters Blast on Aug. 3, 2026
This is an automated notification that DC Water has scheduled a controlled underground blast near the Georgetown University campus as part of the Potomac River Tunnel Project.…
July 29, 2026
- Active Construction
Planned Hazardous Material Abatement in Pre-Clinical Science Building
Start: Friday, Aug. 21, 2026 End: TBD Impact: Planned asbestos-containing material (ACM) abatement work will take place in the Pre-Clinical Science Building. The work…
July 22, 2026
- Active Construction
Planned Power Outage in Walsh Building
Start: Saturday, July 25, 8 a.m. End: Saturday, July 25, 8 p.m. Impact: There will be no power in the Walsh Building. The elevator will be out of service during this outage. If…
July 20, 2026
- Active Construction
Canceled: Planned Outage Impacting Davis Performing Arts Center, Healy Hall, Maguire Hall, White-Gravenor Hall, Walsh, Village A, LXR and Nevils
As of July 27, 2026, the outage below has been canceled. Hot water and heating will not be impacted between Aug. 2 and Aug. 14. Start: Sunday, Aug. 2, 2026, at 7 a.m. …
July 20, 2026
- Active Construction
New Research Building Generator Replacement Project
Start: Monday, May 18, 2026 Preparation work — Monday, May 18 and Tuesday, May 19 Generator demolition using grinders and other equipment — Wednesday, May 20 through, …
July 20, 2026