Archive: Active Construction

15 Articles

Active Construction

Electrical Panel Work in ICC Offices

Start: Monday, Aug. 10, 2026, at 5 a.m. End: Tuesday, Aug. 11, 2026, at 10 a.m. Impact: Please be advised that on Monday, Aug. 10, and Tuesday, Aug. 11, as part of the…

August 7, 2026

Active Construction

Emergency Water Outage in Med-Dent Building

Start: Wednesday, Aug. 5, at 5:30 a.m. End: Wednesday, Aug. 5, at 7:30 a.m. Impact: There will be no domestic hot or cold water available in the Med-Dent Building during…

August 4, 2026

Active Construction

Revised Time: Upcoming DC Clean Waters Blast on Aug. 3, 2026

This is an automated notification that DC Water has scheduled a controlled underground blast near the Georgetown University campus as part of the Potomac River Tunnel Project.…

August 3, 2026

Active Construction

Planned Power, Heating, and Cooling Outage Affecting White-Gravenor Hall and Copley Hall

Start: Saturday, Aug. 8, 2026, at 10 a.m. End: Saturday, Aug. 8, 2026, at 8 p.m. Impact: There will be a planned power, heating and cooling outage in White-Gravenor Hall…

July 31, 2026

Active Construction

Sprinkler Replacement in New North

Start: Friday, July 31, 2026, at 6 a.m. End: Friday, July 31, 2026, at 2 p.m. Impact: On Friday, July 31, as part of the ongoing sprinkler system improvements within the…

July 29, 2026

Active Construction

Upcoming DC Clean Waters Blast on Aug. 3, 2026

This is an automated notification that DC Water has scheduled a controlled underground blast near the Georgetown University campus as part of the Potomac River Tunnel Project.…

July 29, 2026

Active Construction

Planned Hazardous Material Abatement in Pre-Clinical Science Building

Start: Friday, Aug. 21, 2026 End: TBD Impact: Planned asbestos-containing material (ACM) abatement work will take place in the Pre-Clinical Science Building. The work…

July 22, 2026

Active Construction

Planned Power Outage in Walsh Building

Start: Saturday, July 25, 8 a.m. End: Saturday, July 25, 8 p.m. Impact: There will be no power in the Walsh Building. The elevator will be out of service during this outage. If…

July 20, 2026

Active Construction

Canceled: Planned Outage Impacting Davis Performing Arts Center, Healy Hall, Maguire Hall, White-Gravenor Hall, Walsh, Village A, LXR and Nevils

As of July 27, 2026, the outage below has been canceled. Hot water and heating will not be impacted between Aug. 2 and Aug. 14. Start: Sunday, Aug. 2, 2026, at 7 a.m. …

July 20, 2026

Active Construction

New Research Building Generator Replacement Project

Start: Monday, May 18, 2026 Preparation work — Monday, May 18 and Tuesday, May 19 Generator demolition using grinders and other equipment — Wednesday, May 20 through, …

July 20, 2026