Active Construction

Mural Installation at Harbin Terrace

A mural will be installed along the stairs connecting Harbin Terrace and Tondorf Road beginning the evening of Wednesday, Sept. 30.

Installation Details:

  • Date: Wednesday, Sept. 30 through Thursday, Oct. 8
  • Time Window: 7:30 a.m. to 6:30 p.m.
  • Location: Stairs between Harbin Terrace and Tondorf Road
  • Impact: The stairs will remain open and accessible during the installation.
Tagged
Capital Projects Work
Hilltop