Recurring Planned Hot Water and Heating Outages in Pre-Clinical and Basic Science Buildings

  • Timeframe: Friday, Sept. 25 at 6 p.m. to Sunday, Sept. 27 at 11:30 p.m.
    Friday, Oct. 2 at 6 p.m. to Sunday, Oct. 4 at 11:30 p.m.
    Friday, Oct. 9 at 6 p.m. to Sunday, Oct. 11 at 11:30 p.m.
    Friday, Oct. 16 at 6 p.m. to Sunday, Oct. 18 at 11:30 p.m.
  • Impact: There will be a hot water and heating outage in both buildings. Any laboratory work requiring hot water is prohibited for the duration of the outage. Additionally, autoclaves will be unavailable for use during the outage. Alternative autoclave locations include Building D, Room 240 and Medical-Dental Building, NW-401.